Archive by Author

QA/QC Manager

NWP Industries is currently succession planning for a QA/QC Manager for our ASME Section VIII, B31.3 & CWB certified fabrication facility.  This position reports directly to the General Manager and is responsible for implementing and maintaining the corporate quality control and NDE programs. Also responsible to ensure that all finished products meets internal quality control […]

Leave a comment Continue Reading →

Estimator

This position reports directly to the General Manager and is responsible to ensure all quotes are completed accurately and in a timely manner Duties and Responsibilities: Ensure all quotes are completed accurately Ensure all quotes are completed on schedule Work with sales representatives to ensure all details are accurate Work with sales to ensure that […]

Leave a comment Continue Reading →

Instrumentation Technician, Apprentice or Journeyman

This position reports directly to the Electrical and Instrumentation Supervisor and is responsible to accurately install all tubing and fitting components as per fabrication shop drawings.   Duties and Responsibilities: Ensure all work instructions are carried out as per Supervisor directives. Perform duties safely, accurately and in a timely manner. Demonstrate competency Maintain assigned production […]

Leave a comment Continue Reading →

Accounts Payable and Accounting Technician

NWP is currently seeking and Accounts Payable and Accounting Technician. This position is responsible for full cycle Accounts Payable, Payroll and accounting support. This position reports directly to the Sr. Accountant while working with the other accounting staff and departments. Key Responsibilities: Invoice Entry and coding Prepare Cheque Runs Answer vendor inquiries Prepare and post […]

Leave a comment Continue Reading →

B Pressure Welders

This position reports directly to the B Pressure Welding Supervisor and is responsible to accurately fabricate pressure components as per fabrication/shop drawings. (more…)

Comments Off on B Pressure Welders Continue Reading →
SteveG

In Memory of Steve

In loving memory of, Steve Greshner.  Truly loved and deeply missed as a friend, leader and mentor.  Your strength, courage and perseverance will live on through us all forever.

Leave a comment Continue Reading →

400bbl SW, Internally Coated, Heated and Insulated

2 Tanks Available 400bbl Single Wall Weld-In Envirovault Full Internal Coating – Devoe 253 1.5″ Insulation 4 – 4″ 150# RFSO Flanges 1 – 2″ 150# RFSO Flange NWP Standard Gauge Board L – Skid Manway 24″ x 36″ Thief Hatch Ladder with optional OH&S Compliant Cage Serial numbers: 09226 -001 and 002

Leave a comment Continue Reading →

2.0 MM BTU/HR Line Heater Packages

Unit numbers available: 08574 2,000,000 BTU/HR Heater, NWP Industries manufactured. c/w Expansion Tank, 20″ removable U-tube fire tube & Stack Sour service process coil 4″ 2500 ANSI Preheat coil (8 Passes) 4″ 1500 ANSI Reheat coil (8 Passes) B149.3 compliant BMS BMS wired to Class 1 Div 1 Units are insulated with 1-1/2″ Mineral Wool […]

Comments Off on 2.0 MM BTU/HR Line Heater Packages Continue Reading →
NWP-Shell-Can-Award-of-Excellence 064

Shell Canada Supplier of Excellence Award

  NWP Industries Inc. is pleased to announce the receipt of a “Supplier of Excellence” award presented on behalf of Shell Canada. The award was graciously presented to NWP’s staff by Shell Canada and recognizes NWP’s ongoing commitments to Quality, Safety and Customer Service. NWP is very humbled by this award and we are thankful […]

Leave a comment Continue Reading →
IMG_4077 (1)

Employee Appreciation Christmas Lunch

      NWP held a Christmas Lunch as a thank you to all the employees who have made this year another fantastic year. Cheers and Merry Christmas!    

Leave a comment Continue Reading →